Operational information for arrival planning, pilot transfer and manoeuvring at the Port of Motril.

Quick reference

Pre-arrival preparation.

Keep ETA updated and report the vessel’s condition and intended pilot transfer arrangement in sufficient time. Any limitation affecting propulsion, steering, thrusters, draft or manoeuvrability should be communicated before the service begins.

1
Pre-arrival mobile contact
Contact the Pilot Station on +34 636 477 115 approximately 1 hour before arrival at the port.
2
VHF Channel 14
Maintain a listening watch and coordinate the service with the Pilot Station.
3
Pilot boarding point
36° 42’ 6’’ N · 3° 31’ 00’’ W, as published in the 2026 PPP.
4
Pilot ladder
Prepare the pilot transfer arrangement in accordance with current SOLAS requirements and applicable IMO provisions and recommendations.
5
Master/Pilot exchange
Have the information required for a complete Master/Pilot exchange ready: drafts, propulsion, steering, thrusters, tug requirements and any relevant vessel limitations.
Official-source note

The Port Authority’s current technical page states a 100 m channel width and mud seabed. Other official Port publications show 259 m and sand. Before a specific manoeuvre, verify the applicable particulars through current official nautical publications and, where appropriate, with the Port Authority and Pilot Station.

Real-time wind

Measured wind at the Port of Motril

Real-time data from Motril2 · REDMAR 3543, operated by Puertos del Estado. The chart shows mean wind speed, maximum gust and wind direction measured at the port station.

Measured data
Official source: Puertos del Estado · PORTUS · REDMAR 3543
Open in PORTUS ↗

Instrumental information subject to Puertos del Estado quality control. It does not replace communications, instructions or operational procedures applicable to a manoeuvre.

Pilot transfer

Safe pilot transfer.

Pilot transfer is a critical phase of the operation. The boarding arrangement must be correctly rigged, illuminated and attended, with safe deck access and direct supervision by a responsible officer.

IMO

Pilot ladder arrangement reference

Reference diagram to support pilot transfer preparation. The vessel’s actual arrangement must always be checked against current SOLAS and IMO requirements.

Port plan

Visual identification of berths, basins and access routes.

The orthophoto provides a quick visual reference for the main basins, berths and landside access routes within the port area. It must not be used as a navigational document; published depths, restrictions and operational conditions should always be verified before each port call.

Berths

Published berth dimensions and depth data.

The table summarises berth dimensions and depth data published by the Port Authority. “Maximum vessel draft” is a published reference value and must not be interpreted as an instantaneous sounding, available UKC or operational clearance for a particular vessel.

Operational reference data table
BerthLengthDepthMax. vessel draftMain use
Costa299 m8.00 m7.6 mRo-Pax
Levante284 m8.00 m7.6 mRo-Pax
Poniente107 m7.30 m6.4 mBulk / passenger
Graneles260 m10.00 m9.2 mBulk / general cargo
Dique860 m13.50 m12.0 mPassenger / bulk / general cargo
Azucenas607 m13.50 m12.0 mRo-Pax / bulk / general cargo
Contradique252 m13.50 m12.0 mLiquid bulk
Fishing harbour458 m4.50 m4.0 mFishing / aquaculture
Bathymetry

Bathymetry available for technical consultation.

The November 2023 bathymetric survey is provided in its original format, with direct access to the sheets of greatest operational interest so that soundings and contours can be reviewed at adequate resolution.

Survey dated November 2023. The datum and vertical reference must be interpreted from the document title block. The survey is a technical reference and does not replace official nautical charts, Notices to Mariners or current hydrographic information applicable to a specific manoeuvre.